from frame structure to complete home
Innosteel Building Systems Logo
 

The future of building is in steel frame houses.
A steel frame can be assembled in about a week!

Innosteel homes can be built with almost any type of foundation and can be finished with a variety of exterior materials, such as brick, vermont fibre planks, flat fibre board with a trowel on finish or painted.
Saving costs is a cinch, because much of the frame is factory pre-assembled before the slab is even poured. Frames are delivered to the site.
Frames are light and easy to transport and handle on site.
Exterior walls are erected first onto the cement slab.
Interior walls are connected and possitioned according to floor plan.
Ceiling frame is then installed.
Trusses are erected on top of the ceiling surface.
Steel structure is now complete.
Exterior cladding can consist of a single skin brick wall or fibre cement board, fixed to the wall frames.

Window and door frames are installed.
The insulation material is also added
into this cavity.

Services such as electricity and plumbing, are installed in the wall cavity created by the light steel frames.
Gypsum and fibre cement boards, fixed to the light steel frame, is typically used for internal wall cladding and ceilings.
Large openings can be engineered to accommodate virtually any size door such as large bi-fold doors or slide doors. As well as any size window opening.
Home is now complete, 4 - 6 weeks after the steel structure was delivered.
ABOUT US
BENEFITS OF STEEL
PROCESS
FREQUINTLY ASKED QUESTIONS
CONTACT US
 

P O Box 3072  Honeydew  2040  Gauteng  South Africa
Tel: 011 794 5436   Fax: 011 794 2775    info@innosteel.co.za
©  2009 Innosteel Building Systems, All rights reserved.